Antico Floortech Pvt. Ltd. delivers four core construction disciplines — residential, commercial, industrial, and specialized structural works — under one structured execution standard, from feasibility through to handover. As part of Blue Orbit Group, our teams combine civil engineering expertise with disciplined project management to serve developers, businesses, and industrial clients across India.
From high-rise apartment towers to individual bungalows, we deliver residential structures built for durability, safety, and design intent — including large-scale housing projects executed alongside leading developers such as Kolte Patil, Mantra Properties, Nandan, and Xrbia.
Our residential construction teams manage everything from RCC frame structures and internal/external painting to texture finishing and club-house construction, giving developers a single accountable contractor across the full build lifecycle. Every residential project follows stage-wise quality inspection against approved structural drawings, so possession-ready units meet both regulatory compliance and aesthetic expectations.
We work on apartment complexes up to G+25 storeys, gated bungalow communities, and standalone villas — adapting crew size, scaffolding systems, and material logistics to each project's scale, from a 9,000 sq. ft. clubhouse to a 3-lakh sq. ft. tower.
Structural work is executed in M25–M40 grade concrete depending on load requirements, with Fe500D/Fe550D reinforcement steel, and every pour is logged against a concrete testing register (slump test on-site, cube tests at 7 and 28 days) before the next stage is released. RCC design follows IS 456 (plain and reinforced concrete) and IS 1893 (seismic design), with formwork, curing and cover-block practices standardized across every floor to keep dimensional tolerances consistent from the first slab to the last.
Typical residential timelines: a standalone villa or bungalow runs 6–10 months from foundation to handover; a mid-rise apartment building (G+8 to G+14) typically takes 18–24 months; and large multi-tower townships (G+21 to G+40, phased) run 24–42 months depending on the number of towers released concurrently. We share a stage-wise schedule — excavation, foundation, superstructure, MEP rough-in, finishing, handover — at the estimation stage so developers can plan sales and possession dates with confidence.
We build the structures that host business and public life — engineered to meet institutional codes, footfall demands and long-term operational needs.
Our commercial division handles office campuses, retail complexes, and public-facing institutional buildings, coordinating structural, MEP, and finishing trades under a single project timeline. We've delivered infrastructure works — including clubhouses, boundary walls, and entry gates — for large residential-commercial townships such as VTP Blue Water, giving us direct experience with mixed-use developments where commercial and residential scopes overlap.
For sports and cultural facilities, we manage the additional coordination required for specialized flooring, acoustics, and public-safety compliance alongside standard civil works.
Commercial and institutional projects bring their own compliance layer beyond residential work — fire-NOC-compliant egress widths and staircase counts, structural fire ratings on load-bearing members, disabled-access ramps and washrooms per National Building Code (NBC 2016) provisions, and higher live-load design (typically 3–5 kN/m² for office floors vs. 2 kN/m² residential) to accommodate dense occupancy, filing systems and server rooms. We coordinate these requirements with the client's architect and MEP consultant from the design-freeze stage, so fire, structural and finishing approvals move in parallel rather than causing rework late in the project.
Typical commercial project timelines range from 12–18 months for a standalone office building or retail block to 24–30 months for a multi-building corporate campus, sequenced so that core-and-shell handover for early blocks can begin while later blocks are still under construction.
Industrial-grade builds engineered for load, layout and operational uptime — from sheds to full manufacturing facilities.
Industrial clients need structures that support heavy equipment, high floor-loading, and efficient material flow from day one of operation. Our industrial construction scope covers RCC and structural steel-compatible sheds, warehouse shells, and manufacturing units, with civil works sequenced around MEP and utility installation to minimize handover delays. We size crew and equipment deployment — including centering, shuttering, and concrete testing — to match each facility's floor-loading and clear-span requirements.
Industrial floor slabs are typically designed for 5–15 tonnes/m² floor-loading depending on the intended use (light assembly vs. heavy machinery or racked storage), using vacuum-dewatered or power-trowelled finishes for wear resistance, with saw-cut control joints to manage shrinkage cracking. Clear-span structures are coordinated with the client's PEB (pre-engineered building) vendor where applicable, so foundation and anchor-bolt layouts are locked before steel fabrication begins — avoiding the costly rework that comes from foundation-to-structure mismatches.
We also plan for the utility backbone industrial clients need from day one: trenching and sleeving for power, compressed air and process piping routed before floor-slab pours, adequate turning radius for material-handling equipment, and dock-leveler and loading-bay civil works sized to the client's logistics fleet.
Focused technical scopes — often delivered as standalone contracts alongside larger developer partners — covering structure, protection and finish.
Beyond full turnkey builds, we take on specialized contracts including RCC frame structures, structural repair and retrofitting, renovation and remodeling, waterproofing systems, and interior finishing. This is the segment where Antico has delivered internal and external painting and texture work at scale — including multi-tower projects like Mantra Mirari (3 lakh sq. ft.) and Kolte Patil 24K (1.25 lakh sq. ft.) — making us a trusted finishing partner for developers who need a dedicated specialist rather than a generalist subcontractor.
Waterproofing follows a system-based approach rather than a single coat: surface preparation and crack treatment, followed by chemical (crystalline or polyurethane-based) or membrane waterproofing on terraces, podiums, water tanks and toilet blocks, tested with a mandatory ponding test before it is signed off. Structural repair and retrofitting work — jacketing, crack injection, corrosion treatment on exposed reinforcement — follows a condition-assessment-first approach, so the repair method matches the actual cause of distress rather than treating only the visible symptom.
Every Antico project — regardless of scale — is executed against a common baseline of Indian construction standards and documented material testing.
M25–M40 grade concrete per IS 456, Fe500D/Fe550D reinforcement steel, with slump tests on-site and cube testing at 7 & 28 days for every pour.
Structural design coordinated to IS 1893 (seismic provisions) and IS 13920 (ductile detailing) for RCC frame and shear-wall structures.
ISI-certified cement, steel, and finishing materials, sourced from approved-vendor lists with mill test certificates retained on file.
Zero-accident safety policy on every site, with PPE compliance, fall-protection systems on elevated work, and daily toolbox-talk safety briefings.
We follow structured practices to ensure cost control and schedule compliance from day one.
Site survey, soil investigation review, and scope assessment to establish a realistic execution plan and preliminary budget envelope before design is finalized.
Line-item costing for materials, labour and equipment (Bill of Quantities) before mobilisation, with cost heads tracked separately for structure, MEP and finishing.
Alignment with structural drawings, architects and MEP consultants ahead of execution, including a design-freeze checkpoint to limit costly mid-construction changes.
ISI-certified material sourcing from approved vendors, plus workforce and equipment deployment scheduled against the project's critical path.
Stage-wise construction under dedicated site-supervisor oversight, tracked against timeline with weekly progress reporting to the client.
Final compliance checks against drawings, snag-list closure, and documentation handover (as-built drawings, warranty details) before client handover.
Turnkey and specialized-trade contracts for residential and mixed-use developments, with the site-management discipline to keep possession dates on schedule across multi-tower phased launches.
Office campuses, retail and institutional buildings delivered with fire-NOC and NBC-compliant design coordination from day one, minimizing approval delays.
Heavy-floor-loading warehouses and manufacturing shells engineered around your equipment layout and logistics flow, coordinated directly with your PEB vendor where applicable.
We are headquartered in Baner, Pune, Maharashtra, and currently execute residential, commercial and industrial projects across Maharashtra, with our project pipeline expanding pan-India as part of Blue Orbit Group's growth.
Timelines depend on scope and built-up area. A clubhouse or bungalow cluster may take a few months, while multi-tower residential projects (G+21 to G+40) are typically phased over one to three years. We provide a detailed schedule during the feasibility and estimation stage.
Both. We take on full turnkey contracts covering structure, MEP and finishing, as well as standalone specialized contracts such as painting, waterproofing, or structural repair for developers who already have a primary contractor in place.
We use ISI-certified materials, conduct concrete and material testing, and run stage-wise quality inspections against approved structural drawings before any work is signed off, backed by a zero-accident safety policy on every site.
Share your project type, location and approximate built-up area through our contact page, and our planning engineer will follow up with a feasibility and estimation timeline.
Yes — Antico Floortech Pvt. Ltd. is the flagship infrastructure company of Blue Orbit Group, a diversified enterprise also operating in security services through BlueOrbit Security Shield, logistics through BlueOrbit Transportation, and bioenergy & process engineering through BlueOrbit Industries.
We use M25–M40 grade concrete depending on structural load requirements, with Fe500D/Fe550D reinforcement steel. Structural design follows IS 456 for reinforced concrete and IS 1893 for seismic detailing, with slump tests on-site and cube tests at 7 and 28 days for every concrete pour.
Both. We offer full turnkey delivery covering structure, MEP coordination and finishing under one contract, and we also take on standalone specialized trades — such as painting, waterproofing, or structural repair — for developers who already have a primary contractor and need a dedicated specialist for one scope.
Yes. Industrial floor slabs are typically designed for 5–15 tonnes/m² depending on use, and for pre-engineered building (PEB) projects we coordinate foundation and anchor-bolt layouts directly with your steel vendor before fabrication begins, to avoid mismatches between foundation and structure.
We follow a system-based approach: surface preparation and crack treatment, followed by chemical (crystalline or polyurethane-based) or membrane waterproofing on terraces, podiums, water tanks and toilet blocks — always closed out with a mandatory ponding test before the area is signed off.
We start with a condition assessment to identify the actual cause of distress — rather than treating only visible symptoms — before selecting the repair method: jacketing, crack injection, or corrosion treatment on exposed reinforcement, as required.
Yes. We coordinate with the client's architect and MEP consultants from the design-freeze stage onward, aligning structural drawings, fire-NOC requirements and utility routing before execution begins — which keeps approvals and construction moving in parallel rather than causing rework.
Every site operates under a zero-accident safety policy, with mandatory PPE compliance, fall-protection systems for elevated work, and daily toolbox-talk safety briefings for all crew, in addition to our stage-wise quality inspection process.
Yes — final handover includes snag-list closure, as-built drawings, and warranty documentation for materials and systems used, so the client has a complete record of what was built and installed.
Share your scope of work and we'll walk you through our estimation process.